vrijdag 4 april 2014

CONSTRUCTION DAY 2

cONSTRUCTION

Day 2:

We began sewing the impermeable fabric.





Then we inserted the tubes in the fabric and connected the fabric by the rings with the top of the tubes.




We made holes in the base of the fabric, and inserted the rope, which is attached to a stone with a net around it. And we inserted it into the orange tube. This is our counterweight to make sure the fabric stays in the tube.




Following, we attached the net with the corners of the top of the impermeable fabric to the rings and then we secured everything with some tension straps.




The last step this day was secure that all the tubes stay together using a a tension strap through the pipes and using 2 metal tension straps around the tubes.


Geen opmerkingen:

Een reactie posten